Experience in Procedures and works for the Consent of Easement of Passage: Topography and Consent of Easement of Passage for CFE
February-November 1995 (399 km)
Guaymas II – Hermosillo IV = 150 Km.
Hermosillo IV – Meza del Seri = 24 Km
Hermosillo IV – Puerto Libertad = 225 km
Topography and Consent of passage of 150 Kms of Transmission line of Cabo Bello - El Triunfo, in the State of Baja California Sur, for CFE
April-Nov 1996 (150 km)Which includes: Topographic works, investigation of cadastral information, assembly of cadastral information, Assembly of the topographic survey, consent of passage through Ejidos and individuals located in the following municipalities of Baja California Sur.· Cabo bello· San José del Cabo· Santa Anita· Los Barriles· San Bartolo· El Triunfo
Photogrammetry and Topography for Sonora Pipeline and Sonora LNG Terminal of the Sasabe - Don Station gas pipeline line with 795 km long.
Topography of the line of the Sasabe – Puerto Libertad gas pipeline with 126 km long
Feb - Aug 2013IENOVA I include: Reconstruction of polygons according to deeds, insert them in the physical lifting of the line with location of fences, roads, streams, roads, CFE lines and existing gas pipelines. Delivery of plans for negotiation and informative larguillo.